Regulations

Any mezzanine floor project needs to conform to approved Building Regulations and Health & Safety issues and laws.  We can advise on these issues once we start the design process, however to help you we have provided links to government and advisory sites. All of these links open in a new browser window.

Building Regulations

Part A (Structural safety)

Part B (Fire safety)

Part C (Resistance to contaminants and moisture)

Part D (Toxic Substances)

Part E (Resistance to sound)

Part F (Ventilation)

Part G (Sanitation, Hot Water Safety and Water Efficiency)

Part H (Drainage and waste disposal)

Part J (Heat producing appliances)

Part K (Protection from falling)

Part L (Conservation of fuel and power)

Part M (Access to and Use of Buildings)

Part N (Glazing safety)

Part P (Electrical Safety)

Workmanship and Materials

 

Health & Safety Legislation

General information for the construction industry: http://www.hse.gov.uk/construction/index.htm

Construction design and management (CDM)

 

“Hi-Store acted as the lynchpin for the project, working closely with Homebase, architectural design consultants, structural engineers and the main shop fitting contractors.

Homebase's image and products are all important and the mezzanine floor is cleverly integrated into the existing building design."

Project Manager, Homebase

Talk to a Hi-Store Expert

Fill in the quick form below and one of our expert Hi-Store team will get in touch with you via a contact method, and at a time and day, of your choosing.

How would you like us to contact you?